Recently, a new version of the Business Process Modeling Notation (BPMN 1.1) was published. A document written bei HPI researcher Gero Decker and HPI graduate Torben Schreiter investigates the novel aspects of BPMN 1.1; Torben is now with Inubit AG, a Berlin based company specializing in business process management.
Errata
On page X, "Dolf Grünberg" needs to be substituted by "Dolf Grünbauer"
Page 96, Definition 3.4, line 6: "an event ordering" instead of "an event orderings"
Page 216, first paragraph: The term "completed" is used with the meaning "immediately stopped".
Page 272, last line: "t1" instead of "t2"
Figures
Page 136, Figure 4.14: the example could use an end event after the exclusive or split, so that the otherwise infinite loop is terminated
Page 147, Figure 4.25: Figure illustrates "sequential execution without a priori design time knowledge" pattern. It might be misleading that the BPMN semantics of the subprocess is parallel execution of B,C, and D.
Page 156, second paragraph: "... determined the not by only ..." should read "... determined not only by ...". Also on this page "remainder" instead of "reminder".
Page 163, Figure 4.34: Arrows in the lower part should be directed from the connector to the event nodes, for the XOR connector, the OR connector, and the AND connector.
Page 205, Figure 4.76: The CreditInfo input and output parameters of the Accept Credit activity should be "CreditInfo = [Jane, 16000]", not "CreditInfo = [Miller, 15000]"
Page 261, Figure 5.35: Auctioning Service is the Receiver participant role, not the Sender participant role as indicated.
References
Martens (2003c), van der Aalst and Weske (2001b), Mohan (2002b), and Workflow Management Coalition (2005b) are redundant
Title in Zaha et al. (2006a) needs to be changed to "Let's Dance: A Language for Service Behavior Modeling"